Owners adding capacity near Los Lunas are building next to a campus that has already tested every supplier, inspector and field crew in the valley, and we plan a job here around that fact. Meta announced its Los Lunas data center in September 2016 and opened it in February 2019. By July 2025 the campus was over 4 million square feet with seven operating buildings and three more under development. A support-facility developer or a manufacturer arriving in the same labor market has to schedule against that demand rather than around it, so the first thing we ask is which trades and which delivery windows are already spoken for.
We build ground-up industrial work in Los Lunas: site grading, utilities, slab-on-grade floors, tilt-wall and structural steel shells, equipment pads, and the tie-in to whatever is already running. The village sits on State Highway 6 east of Interstate 25, on the west bank of the Rio Grande, and NM 314 serves the area as well. Those roads set our haul plan for aggregate, rebar and precast, and we confirm axle limits and delivery hours with the owner before the first truck is scheduled.
Gate to gate, the owner sees the same steps on every Los Lunas job: a site walk, a signed permit to work for each crew, a laydown plan marked on the drawings, and a weekly look-ahead that names every inspection. Nothing about the sequence is improvised, and nobody on our site starts a task that the look-ahead has not already described.
Scope we carry on a Los Lunas industrial site
On most Los Lunas projects we closely schedule and supervise the earthwork, the formed and flatwork concrete, and the sequencing of the building erection. A site near the river needs a drainage plan before it needs a foundation plan, so we set finished grades, swales and a detention outlet to give storm water a defined path off the pad, and we show that path on the drawings the reviewer sees. Where the owner wants a process building, we add the equipment pads and pits to the same pour schedule so the slab is cut once, not twice.
Electrical, process piping and controls normally go to licensed specialty contractors, and we manage them under the same permit-to-work system we use for every trade on site. That keeps hot work, excavation and energized tie-ins on a single written list. Our ground-up industrial construction work in the valley starts with that coordination, because the pad is only useful when the utilities arrive on the day the building needs them.
Concrete, steel and utilities under one project team
Slab quality is where an industrial owner finds out what a contractor is worth. We place and finish floors for forklift and rack loads with a joint layout drawn before the first truck arrives, and we protect the subgrade from the weather and from other trades while we wait for the pour. Our industrial concrete floors are checked for flatness before saw cutting, with the joints cut inside the window the mix requires.
Underground work follows the same discipline. Duct banks, fire water lines and sanitary tie-ins are trenched, bedded and backfilled under our supervision, with the open length limited to what we can close in a shift. For data center support buildings and generator yards, underground electrical duct banks are the long-lead item that sets the schedule, so we survey the route and release the conduit order well ahead of the footing work.
A schedule built around a busy labor market
A July 2025 report on the Meta campus put construction employment at more than 1,000 workers at peak. That is useful information for a buyer because it tells us the valley has a deep pool of experienced trades and also that those trades are pulled toward the largest jobs. We keep the trade partners for concrete, steel and civil on a rolling schedule, and we name the trades we do not control at the start so the owner can see the real risk in the master schedule.
Delivery on a Los Lunas job follows a plain order. Mobilization and the safety orientation come first, then clearing and rough grade, utilities, foundations, slab, the building envelope, and finally the interior and the tie-ins. Each step has an owner sign-off. If a long-lead item such as switchgear or a rooftop unit is late, we reorder the interior work to keep crews productive and keep the inspection calendar intact.
What moves the price in the valley
Three items usually decide a Los Lunas budget: the amount of imported structural fill the pad needs, the length of the utility tie-in, and the competition for skilled labor. The campus nearby is projected to support 400 operational jobs once its expansion is complete and has generated $145 million in gross receipts tax for the village, which signals a local government used to processing large submittals. It also means owners should price in the cost of attracting labor away from other long-running projects.
We give owners an itemized estimate with allowances called out as allowances and quantities tied to the drawings. If a client is deciding between a tilt-wall shell and a pre-engineered metal building, we price both with the same site package so the comparison is honest, and we show where one option saves weeks while the other saves dollars.
Operators we build for around Los Lunas
Local demand is led by the data center sector and the buildings that support it: generator and switchgear enclosures, warehouse space for spares, maintenance shops and office space for operations staff. Our data center industry work covers the supporting structures and site utilities that an owner needs to keep a campus running while it keeps growing. A November 2021 report said an additional $800 million would bring total investment in the campus to $2.2 billion for nearly 3.8 million square feet, which gives a sense of how much supporting infrastructure follows.
The same corridor suits light manufacturers and logistics tenants who want proximity to Interstate 25 and a lower-density site. The Rail Runner station and the University of New Mexico Valencia campus are both in the village, which matters to employers recruiting technicians. Nearby Belen and Socorro carry the same highway spine south, and we scope projects across all three as one market.
Safety steps before any Los Lunas crew breaks ground
Every worker on our sites completes an orientation, signs onto the permit to work for the day, and reviews the hazards at the task. Excavations are located and potholed before machines dig, trenches are sloped or shored, and heavy equipment moves under a traffic plan that separates trucks from people on foot. We do not treat this as paperwork. It is how a site stays open when an owner, an inspector or an insurer walks it unannounced.
Permitting runs through the state. The 2021 New Mexico Commercial Building Code adopts the 2021 International Building Code as amended and took effect July 14, 2023, and the 2020 New Mexico Electrical Code adopts the 2020 National Electrical Code. We build submittal packages against those editions and keep the inspector's comments in the same log that the field crew reads at the morning meeting.
Bring us your Los Lunas site
Send us the parcel, the building program and the date you need to be operating. We will walk the site, confirm utilities and haul routes, and return a scope with a schedule your team can check against its own.
Common Questions
How does the Meta campus affect trade availability for a new plant?
The campus has employed more than 1,000 construction workers at its peak, so skilled concrete, electrical and steel labor in the valley is in demand. We tell owners at the start which trades we supervise directly and which go to subcontract, and we reserve subcontractors before the pour dates are fixed. That order of operations has protected more schedules than any change order.
What does a typical site package look like on the west bank of the Rio Grande?
It usually combines mass grading, a detention outlet, a stabilized laydown area for trades, truck access off the nearest state route, and utility trenches for water, power and communications. We set the laydown layout first because it determines where cranes, forms and deliveries can sit. The finished grade is then drawn so that water runs away from slabs and toward the outlet.
Do you build the support structures for a data center operator?
Yes. We build generator and switchgear enclosures, spare parts warehouses, maintenance shops, security buildings and operations offices. Each one has its own permit path and its own electrical load, so we plan the underground work for all of them together to avoid cutting the same road twice.
Which codes apply to a Los Lunas building permit?
The 2021 New Mexico Commercial Building Code, which adopts the 2021 International Building Code as amended, took effect July 14, 2023. The 2020 New Mexico Electrical Code, based on the 2020 National Electrical Code, took effect March 28, 2023. We confirm the current plumbing and mechanical edition with the Regulation and Licensing Department before drawings are released, because the state is moving those rules forward.
Related
Related Services
Related Building Types
Ready to talk about your project?
Request a Project ReviewOne project team for the whole sequence
Industrial Contractors of New Mexico reviews the site, the loads, the schedule and the approvals before pricing, then schedules, coordinates and inspects the specialty trade partners from preconstruction through closeout.